Pengcheng National Laboratory
Project: Engineering Design, Procurement, and Construction (EPC) for the Pengcheng Experimental Heterogeneous Optoelectronic Chip Research Platform Site Construction
Location: Shenzhen, Guangdong
Date: 2023
Project Size: RMB 30 million
Delivery Time: 180 days
Service Scope: Purification and Interior Design, Water Supply and Drainage, Electrical, Purification and HVAC, Intelligent Systems, Process Specialty Gases, Process Bulk Gases, Process Pure Water Piping, Process Wastewater Piping, Process Waste Gas, and Process Waste Gas
Key Features: The total installation area for this project is approximately 2,500 square meters, including 580 square meters of Class 100 purification area and 220 square meters of Class 10 purification area. Preliminary design and construction will be based on process production requirements.

Zhejiang Cambridge Communication Equipment Co., Ltd.
Project: Cleanroom Renovation Project for the Jiashan Plant of Zhejiang Cambridge Communication Equipment Co., Ltd.
Location: Jiaxing, Zhejiang
Date: 2024
Investment: RMB 40 million
Delivery Time: 120 days
Service Scope: Cleanroom renovation, water supply and drainage, electrical, cleanroom HVAC, intelligent systems, process bulk gas, process pure water piping, process wastewater piping, and process waste gas
Key Features: The project covers an area of 11,897 square meters, with a construction area of 47,422 square meters, involving approximately 27,000 square meters of cleanroom renovation. The primary product is optical modules.

Shanghai Linzhong Electronic Technology Co., Ltd.
Project: Shanghai Linzhong Electronics New Factory Project, Cleanroom Renovation Project
Location: Shanghai
Date: 2023-2024
Project Size: 27 Million RMB
Delivery Time: 120 Days
Service Scope: Cleanroom renovation, water supply and drainage, electrical, cleanroom HVAC, intelligent systems, bulk process gas, process wastewater piping, process exhaust gas, and secondary distribution
Key Features: This project is for a power module manufacturing workshop, with a cleanroom area of approximately 7,000 square meters.

Dongguan Jingcai Optics Co., Ltd.
Project: New Factory Building, High-Efficiency and Energy-Saving Plant System Engineering Project
Location: Dongguan, Guangdong
Date: 2024
Project Size: RMB 29.27 million
Delivery Time: 120 days
Service Scope: High-efficiency refrigeration station, purification and renovation, water supply and drainage, electrical, purification and HVAC, intelligent systems, process pure water piping, process wastewater piping, process wastewater, and process exhaust
Key Features: The total project installation area is approximately 12,000 square meters, including 400 square meters of Class 1000 purification area and 3,600 square meters of Class 10,000 purification area. Design and general construction services are provided based on process production requirements. (In particular, the ultra-precision area requires temperature control stability within the nanometer range.)

Guangdong Nano Intelligent Manufacturing Industry Innovation Center Co., Ltd.
Project: National Nano Intelligent Manufacturing Industry Innovation Center Micro-Nano Processing Platform Construction Project Phase II Design and Construction General Contracting Project
Location: Guangzhou, Guangdong
Date: 2020-2024
Project Size: RMB 78 million
Delivery Time: 180 days
Service Scope: Cleanroom renovation and design and construction of cleanroom-related electromechanical systems (including fire protection, air conditioning, pure water, wastewater, exhaust gas, waste liquid systems, power, FMCS, bulk gas, specialty gas, and secondary distribution).
Key Features: This project covers a cleanroom renovation area of 7,020 square meters, including a Class 1000 cleanroom on the first floor, a technical mezzanine on the second floor, and Class 100 and Class 1000 cleanroom renovations on the third floor. According to the process production requirements, we carry out scheme design, construction drawing design (including building information modeling) of various related disciplines such as clean engineering, water supply and drainage, electrical, purification HVAC, intelligentization, process special gases, process bulk gases, process pure water pipelines, process wastewater pipelines, process exhaust gas, fire protection, procurement and construction of mechanical and electrical equipment, and secondary wiring and piping installation of production equipment.

Xiamen Tianma Optoelectronics Co., Ltd.
Project: FMCS Plant Monitoring System Engineering for Xiamen Tianma Optoelectronics Co., Ltd.'s 8.6th Generation New Display Panel Production Line
Location: Xiamen, Fujian
Date: 2023
Project Size: RMB 45 Million
Delivery Time: 524 Days
Service Scope: Automatic FMCS and Security Systems
Key Features: Located in Xiamen's Xiang'an District, with a total construction area of approximately 385,000 square meters, the project primarily includes the construction of the main structures (structures) including the box-forming and color film production plants, a natural gas pressure regulating station, and related engineering. Future products are primarily targeted at the automotive display market, IT display (tablets, laptops, monitors, etc.), and industrial display applications.

Shanghai Dingtai Jiangxin Technology Co., Ltd.
Project: FMCS System Engineering for the F16-01 Plot Project in the Lingang Heavy Equipment Industrial Zone, Shanghai Dingtai Jiangxin Technology Co., Ltd.
Location: Shanghai
Date: 2022
Project Size: RMB 22.36 million
Delivery Time: 199 days
Service Scope: Automatic FMCS System
Key Features: Wingtech Technology's 12-inch automotive-grade wafer fab project has a total bid of RMB 12 billion, covering an area of approximately 130,000 square meters (195 mu) and a total construction area of approximately 205,000 square meters. The projected annual production capacity is approximately 360,000 wafers, primarily producing power devices such as MOSFETs, GaN FETs, and SiC FETs. Project Details: Establishment of a comprehensive Factory Facility Monitoring and Control System (FMCS). The FMCS primarily encompasses monitoring and control of various factory facilities, energy management, an intelligent factory operations and maintenance platform, leak monitoring, and SPC.

Wuhan Huaxing Optoelectronics Technology Co., Ltd.
Project: FMCS System Engineering for the 6th Generation LTPS Semiconductor New Display Device Production Line Expansion Project
Location: Wuhan, Hubei
Date: 2022
Project Size: RMB 11.99 million
Delivery Time: 230 days
Service Scope: Automatic FMCS System
Key Features: This 6th Generation LTPS Semiconductor New Display Device Production Line Expansion Project has an estimated total investment of RMB 15 billion, a total construction area of 545,000 square meters, and a production capacity of 30,000 units per month. The T5 production line utilizes VR technology, touchscreen technology (touch panel + active pen technology), MiniLED backlight display technology, and LTPO technology. It primarily produces small and medium-sized LTPS TFT-LCD displays for high-end display products such as automotive, laptop, tablet, and VR display panels. Project Content: Provide a complete intelligent control system for ice machines.

Runpeng Semiconductor (Shenzhen) Co., Ltd.
Project: Runpeng Semiconductor 12-inch Integrated Circuit Production Line FMCS Automation Project
Location: Shenzhen, Guangdong
Date: 2023
Project Size: 18 million yuan
Delivery Time: 180 days
Service Scope: Automatic FMCS System
Key Features: The Runpeng Semiconductor 12-inch Integrated Circuit Production Line project has a total investment of 22 billion yuan. The project focuses on analog specialty processes above 40 nanometers. The products are primarily used in automotive electronics, new energy, industrial control, consumer electronics, and other fields.

Tongwei Solar (Meishan) Co., Ltd.
Project: High-Efficiency Crystalline Silicon Solar Cell (Phase IV) Supporting Basic Weak Current System Project
Location: Sichuan
Date: 2023-2024
Project Size: RMB 64 Million
Delivery Time: 100 Days
Service Scope: Automatic FMCS System, FMCS System, Weak Current System, Energy Management, and Leak Detection
Key Features: Located in Dongpo District, Meishan City, Sichuan Province, the project site covers 500.15 mu (approximately 16 acres) and has a construction area of 258,000 square meters. The project primarily comprises a production plant, an intelligent production line for high-efficiency crystalline silicon solar cells, auxiliary buildings, and ancillary and supporting facilities. Upon completion, the project will form a smart factory with an annual production capacity of 16GW of high-efficiency crystalline silicon solar cells.

Tongwei Solar (Pengshan) Co., Ltd.
Project: Global Innovation Base (Phase I) S1 Workshop and Auxiliary Building Weak Current System Engineering
Location: Sichuan
Date: 2023
Project Size: RMB 10.6 Million
Delivery Time: 100 Days
Service Scope: Automatic Control, FMCS, and Security Systems
Key Features: The first phase of the project, with a planned total investment of RMB 6 billion, will construct a high-efficiency crystalline silicon solar cell intelligent manufacturing plant and supporting facilities such as environmental protection and warehouses. Upon completion, it will have an annual production capacity of 16GW, making it the largest high-efficiency crystalline silicon solar cell intelligent plant in the industry in terms of unit investment intensity, single-unit production capacity, and leading process technology.