Zhejiang University — Zhejiang Chuangxin Integrated Circuit Co., Ltd.
Publish Time: 2025-10-16
Zhejiang University — Zhejiang Chuangxin Integrated Circuit Co., Ltd.
Project: Renovation Project of the Micro-Nano Ultra-Clean Laboratory Wide Bandgap Semiconductor Platform at the Zhejiang University Hangzhou International Science and Innovation Center (Startup Area – Scenario Valley) – Design and Construction Integration Project
Location: Hangzhou, Zhejiang
Duration: 2020
Project Scale: RMB 76 million
Delivery Period: 150 days
Scope of Services: Cleanroom renovation, plumbing and drainage, electrical systems, cleanroom HVAC, intelligent control systems, process specialty gas, process bulk gas, process ultrapure water pipelines, process wastewater pipelines, process exhaust systems, and FMCS automation system.
Main Features:
Main Product: Wide Bandgap Semiconductor Experimental Platform
The project involves renovation and construction of the LAB and CUB to create a functional space for the smooth operation of the wide bandgap semiconductor experimental platform. It also includes the construction of outdoor pipe corridors, connecting corridors, material warehouses, a new Class A chemical warehouse, gas rooms, and auxiliary buildings. The work covers cleanroom-related MEP installation, general MEP installation, and facility systems engineering such as ultrapure water, wastewater, exhaust gas, and gas/chemical supply systems. The main clean research area and utility area cover approximately 3,000 square meters. System design and main system capacity fully meet the process requirements of the research platform.
Zhejiang University — Zhejiang Chuangxin Integrated Circuit Co., Ltd.
Project: Kechuang CMOS 12-Inch Pilot R&D Platform Project
Location: Hangzhou, Zhejiang
Duration: 2021
Project Scale: RMB 470 million
Delivery Period: 360 days
Scope of Services: Cleanroom renovation, plumbing and drainage, electrical systems, cleanroom HVAC, intelligent control systems, process specialty gas, process bulk gas, process ultrapure water pipelines, process wastewater pipelines, and process exhaust systems.
Main Features:
Main Product: 12-Inch CMOS Integrated Circuit Chips
The project involves the construction of newly built LAB1 and CUB facilities to create a smooth-operating micro-nano ultra-clean laboratory platform. It also includes the construction of outdoor pipe corridors, connecting corridors, material warehouses, a new Class A chemical warehouse, gas rooms, and auxiliary buildings. The work scope includes cleanroom-related MEP installation, general MEP installation, and facility systems engineering such as ultrapure water, wastewater, exhaust gas, and gas/chemical supply systems. The main clean research area and utility area cover approximately 30,000 square meters. System design and main system capacity fully meet the process requirements of the research platform.